Advice
How Long Does a Home Renovation Take?
A realistic look at London renovation timelines, sequencing and the factors that affect programme length.

Practical guide
How Long Does a Home Renovation Take?
There is no honest one size answer. A focused room refurbishment might take weeks, while a whole home renovation can take several months once strip out, services, plastering, drying times, decorating, flooring and snagging are included.
- The biggest timing factors are scope, permissions, lead times, access, hidden defects and decision speed.
- Drying times, inspections and trade sequencing need room in the programme.
- Living in the property during works often slows the sequence because areas need to stay usable.
- A clear scope before work starts is the best way to reduce drift.
Next step
Turn the idea into a sensible scope
Early advice is useful, but every London property has its own quirks. The next useful step is a clear conversation about the property, the work, the constraints and the level of finish you want.
Planning work on a London property?
Send a short message about the property, the work you need and your ideal timing. We'll help you shape the next step.
Request a Quote